# Phase 0 record **Phase 0 complete, 2026-11-26.** Deliverables: licence, README, docs (one per chip and subject), the oracle ladder, the MAME recipe (run), the census (run), pinned references (fetched and verified), and the handoff brief with its open decisions. Not done, by design: no emulator code; the Nutting manual is not pinned (decision 6); the drawings in SYS (memory-map figures, timing diagrams) were not read from the scans; the BASIC sources were not pinned (decision 5).