# Phase 0 status **Phase 0 complete, 2026-11-26** (one session). The brief is [handoff-brief.md](handoff-brief.md); it ends with fourteen open decisions. - Pinned and verified: 21 documents (Acorn's service manuals for the A/B, B+ and Master, the Master Reference Manual and hardware specification, circuit diagrams, the Advanced User Guide, data sheets for the HD6845S, MC6845, R6522, SAA5050, 8271, WD1770, uPD7002, MC6850) and one repository (Tom Seddon's b2 test volume, blobless sparse, `2cd8e53`). - Run: the firmware census (15 of 15 MAME romsets, 49 distinct images by SHA-1), the software-list census (10 lists, 3,544 entries; no BBC software on the mirror), MAME 0.285 boots of `bbcb`, `bbcbp`, `bbcm` to BASIC and a 50-frame trace of the Model B's 6502 (570,564 instructions), OCR of 100 data-sheet pages. - Set aside: the B service manual zip's Acorn test-ROM image and programs (moved to /data/backup unopened; the fetch script skips them); b2's drive 2 (commercial loaders). - Not done, by tonight's compute rules: no emulator other than MAME was run; no B2T test was run (they need a board or a detector built in emu-tools-gpl); no Master trace. - Next step: Aubrey's decisions (first 1 and 2, the shared cores), then milestone M0/M1.