# Phase 0 status **Phase 0 complete (2026-11-26).** Every deliverable is in place: licence, README, the document set ([README.md](README.md)), pinned references (25 files, `--verify` clean), the firmware census (49 of 49 by SHA-1) and software census (no local sets; MAME's lists counted), the MAME recipe run on four machines, and the handoff brief ending with twelve open decisions for Aubrey. Not done, by design: no emulator code; no XRoar or VCC (GPL closed boxes, emu-tools-gpl only if decision 12 is taken); no Dragon Data documents (none found that a robots-respecting fetch could reach); the CoCo 3's GIME has only a summary ([gime.md](gime.md)). Blocked on: m6809-python's core (Phase 0 only today) for milestone 1.