# Phase 0 status **Phase 0 complete (2026-11-26).** Done and checked: repository, MIT licence, fetch script with 6 pinned files (`--verify`: 0 problems), census (167 of 167 sets complete and verified), MAME recipe run (traces of 3 and 30 frames from reset, a snapshot), one document per subject, the oracle ladder, provenance, and the handoff brief with its open decisions. Not done: the TTL shifter and the sound circuits were not traced from the schematic sheets (U6, U7, C1: milestone work); no SN76477 datasheet was found (U9).