# Phase 0 status Phase 0 complete, 2026-11-26. Done and checked: references fetched and pinned (60 files, `--verify` clean; MAME files gated on their BSD-3-Clause lines), the census of all 99 Model 1/2 sets (every ROM present by CRC) with board ROM SHA-1s, the MAME recipe run on `vf2` (snapshot and i960 trace), one document per subject, the domains-and-speed analysis against the late-era method, the handoff brief with open decisions M1-M12. Not done: a copro (`:copro_tgp`) trace and the FIFO-density measurement (domains-and-speed.md, "First measurements"), left for the board's first session.