# Phase 0 status **Phase 0 complete, 2026-11-26.** Documents, pins (GBATEK; nine repositories, all fetched and verified), fetch script with verify mode, census of the three No-Intro 3DS sets (headers only; firmware by SHA-1), handoff brief with open decisions. The next session starts from [handoff-brief.md](handoff-brief.md) after Aubrey's decisions K1-K3 and N1. Not done: no homebrew built (no devkitARM on this machine); teakra's hardware results (Git LFS, 357 MB) not fetched; GBATEK's GPU chapters read for structure, not transcribed.