# Phase 0 status **Phase 0 complete, 2026-11-26** (one session). The brief is [handoff-brief.md](handoff-brief.md); it ends with eight open decisions. - Pinned and verified: 3 files (Hitachi's HD6301/HD6303 Series Handbook, jrok's two CUS60 pages). - Run: the census (41 of 41 sets complete by SHA-1; one MCU image), MAME 0.285 `-listxml` over System 1 and over all of MAME (chip consumers), four 2-second CPU traces of Pac-Mania (main, sub, sound, MCU), one address-map dump. - Not done: no key-window or CUS117 watchpoint trace (U1, U7); no pictures or audio taken; no operator manual or schematic found in a permitted copy. - Next step: Aubrey's decisions, then milestone C0 (the cores).