# Phase 0 status **Phase 0 complete, 2026-11-26** (one session). The brief is [handoff-brief.md](handoff-brief.md); it ends with four open decisions. - Pinned and verified: 11 Toshiba documents (SHA-256), ares's TLCS-900/H source and six SingleStepTests/tlcs900h forms (sparse, by commit): `fetch_references.py --verify`, 0 problems. - OCRed: the eight image-only 900/H PDFs (`ocr_references.py`; the 220-page TMP95CS64F data sheet is pinned but not OCRed). - Run: the SST survey (6 forms x 1,000 records; all transaction clocks zero), one MAME 0.285 trace of the NGPC BIOS (3 frames, 66,779 instructions). - Not done: no hardware oracle exists to fetch; the TMP95CS64F's micro-DMA and interrupt chapters are not yet read (U4, U7: read before milestone M4). - Next step: Aubrey's decisions, then milestone M1.