# Phase 0 status **Phase 0 complete, 2026-11-26** (one session). The brief is [handoff-brief.md](handoff-brief.md); it ends with eleven open decisions. - Pinned and verified: 54 files (Williams theory of operation, drawing sets and service recaps with their archive OCR text; Sean Riddle's hardware pages, blitter RAM dumps and WETS programs; Motorola MC6809E, MC6821 and programming-manual scans; the Harris HC-55516 and HC-55564 data sheets). - Run: the census (59 sets, all complete), MAME 0.285 board-event runs of Robotron (16 s), Sinistar (20 s) and Defender (8 s). - Not done: no speech capture (Sinistar needs a coin-up run); Riddle's Saleae captures and his 222-blit second set are not fetched; the drawing sets were read only where a fact needed them (the sound board sheet); the early Defender theory book was not read through. - Next step: Aubrey's decisions; the m6809-python core (M0); then milestone 1.