# Phase 0 status (2026-11-19) The restart's first job, rewriting the specification from permitted sources, is done. No core code exists. ## Done - Specification: registers, FM, SSG, ADPCM-A, ADPCM-B, clocking and output, every claim tagged and cited; C1-C12 and U1-U12 listed in [handoff-brief.md](handoff-brief.md). - The closed-box probe rewritten to read pins only (the carried version read one internal accumulator; that read is gone) and extended to sixteen measurements; results in `validation/results/lle2610_probe-2026-11-19.txt`. - `validation/check_tables.py`: ymfm's detune, log-sine, exponent and ADPCM-A step tables checked against the OPNA manual, closed forms and Dialogic's list. - `validation/fit_adpcma.py`: the ADPCM-A decoder fixed by the closed box. - NOTICE with ymfm's and Geolith's BSD-3 notices; a fresh [provenance.md](provenance.md). ## Open - **Decision 1** as rewritten: awaiting the owner. - The sibling question (FM/SSG reuse): open; the experiment is in [siblings.md](siblings.md). It needs the owner's word on reading the models' public pin headers beyond `fmopna_2610.h` (the session's permission check refused opening `fmopna_impl.h`, and it was not read). - The ADPCM-B bus and the full ROM-serving driver (U4) wait on the same word. - U2 (ADPCM-B scaling) and U6 (LFO periods) are the next probe experiments that need nothing new. ## Next 1. Owner: confirm decision 1; rule on reading the models' pin headers. 2. Rung 0 (tables) and rung 1 (bus, status, timers) can start now: they need nothing beyond the specification and the probe.